[ IGB POS Planner ]   v0.65.1 (Aug 11 2021) final (Changelog)
Planning your POS in-game since 2005!
Created & Developed by Qalten [EVE] [Reddit]
Suggestions? Post in this thread!
Caldari Large Control Tower  (Change)
[Start New POS][Clear Modules][Build URL]
Powergrid:2,090,000 / 2,750,000 76.00 %
CPU:5,500/ 7,500 73.33 %
Shield Resists:
49%     25%     41%     50%    
Average DPS: ?095,363,000 EHP?

Calc Fuel for
Fuel Reduction: Enable Alliance Sovereignty

Required Fuel for 1 hours :
Nitrogen Fuel Block: 40
Fuel Cargo Volume:
200.00m3
Estimated Fuel Cost:
0 ISK
Deployment:  (CT + MOD | Modules Only)
Total Deployment Volume: 233,000.00m3
AnchorOnlineTotalUnanchor
34m 45s138m 9s172m 54s64m 45s

Add New Module: (Only / Include Faction Modules)
Research Capabilities
  Copying
  Invention
  Material Efficiency
 No Separations | Display Shopping List 
  Module   PWG (MW) CPU (tf) Value 
Production
 3 x Design Laboratory360,000 MW     1,800 tf   0 ISK   X
 
Defence
 12 x Dread Guristas Ion Field Projection Battery240,000 MW     600 tf   0 ISK   X
 12 x Dread Guristas Phase Inversion Battery240,000 MW     600 tf   0 ISK   X
 12 x Dread Guristas Spatial Destabilization Battery240,000 MW     600 tf   0 ISK   X
 13 x Dread Guristas White Noise Generation Battery260,000 MW     650 tf   0 ISK   X
 3 x Explosion Dampening Array450,000 MW     750 tf   0 ISK   X
 2 x Photon Scattering Array300,000 MW     500 tf   0 ISK   X
 
Services
 
Offline Modules (Anchor time: 0m 5s - Online time: 2m 0s)
 1 x Dread Guristas Phase Inversion Battery20,000 MW     50 tf   0 ISK   X
 
Estimated Tower Cost:  0 ISK   
Estimated Module Cost:  0 ISK   
Estimated Total Cost: ?  0 ISK