[ IGB POS Planner ]   v0.65.1 (Aug 11 2021) final (Changelog)
Planning your POS in-game since 2005!
Created & Developed by Qalten [EVE] [Reddit]
Suggestions? Post in this thread!
Caldari Large Control Tower  (Change)
[Start New POS][Clear Modules][Build URL]
Powergrid:1,620,000 / 2,750,000 58.91 %
CPU:4,700/ 7,500 62.67 %
Shield Resists:
41%     25%     0%     50%    
Average DPS: ?083,353,000 EHP?

Calc Fuel for
Fuel Reduction: Enable Alliance Sovereignty

Required Fuel for 1 hours :
Nitrogen Fuel Block: 40
Fuel Cargo Volume:
200.00m3
Estimated Fuel Cost:
0 ISK
Deployment:  (CT + MOD | Modules Only)
Total Deployment Volume: 217,000.00m3
AnchorOnlineTotalUnanchor
34m 25s130m 9s164m 34s64m 25s

Add New Module: (Only / Include Faction Modules)
Research Capabilities
  Copying
  Invention
  Material Efficiency
 No Separations | Display Shopping List 
  Module   PWG (MW) CPU (tf) Value 
Production
 3 x Design Laboratory360,000 MW     1,800 tf   0 ISK   X
 
Defence
 13 x Dread Guristas Ion Field Projection Battery260,000 MW     650 tf   0 ISK   X
 11 x Dread Guristas Phase Inversion Battery220,000 MW     550 tf   0 ISK   X
 11 x Dread Guristas Spatial Destabilization Battery220,000 MW     550 tf   0 ISK   X
 13 x Dread Guristas White Noise Generation Battery260,000 MW     650 tf   0 ISK   X
 2 x Explosion Dampening Array300,000 MW     500 tf   0 ISK   X
 
Services
 
Offline Modules (Anchor time: 0m 15s - Online time: 4m 3s)
 1 x Design Laboratory120,000 MW     600 tf   0 ISK   X
 2 x Photon Scattering Array300,000 MW     500 tf   0 ISK   X
 
Estimated Tower Cost:  0 ISK   
Estimated Module Cost:  0 ISK   
Estimated Total Cost: ?  0 ISK